Purpose
Define the procedure for deploying updates to the eStudent 360 platform.
Environments
- Development — Local development environments for feature work
- Staging — Pre-production environment mirroring production configuration
- Production — Live environment serving users
Release Process
- Feature Development — Developer works on feature branch, writes tests, and submits pull request
- Code Review — At least one reviewer approves the PR. Focus areas: functionality, security, accessibility, and low-bandwidth compatibility
- Staging Deployment — Merged code deploys automatically to staging
- QA Verification — Test on staging environment. Must include low-bandwidth simulation testing (throttled to 3G)
- Production Deployment — After QA sign-off, deploy to production during low-traffic window
- Post-Deploy Verification — Smoke tests on production. Monitor error rates and performance metrics for 30 minutes
- Rollback — If issues detected, rollback to previous version within 15 minutes
Hotfix Process
For critical production issues (security vulnerabilities, data loss, complete feature failure):
- Branch from production
- Fix, test locally, get expedited review
- Deploy directly to production with immediate monitoring
- Cherry-pick fix back to main development branch
Database Migrations
All schema changes must be backwards-compatible. Destructive migrations (column drops, table drops) require a two-phase approach: deprecate first, remove in a subsequent release after confirming no dependencies.